- in addition to the last small modification I requested above,
- would it be possible to do as in the mammotion integration to solve the problem of respecting the order of selection of parts?
Intégration externe - Mammotion - #41 par prohand.
4. Order of zones
The zones are now mowed in the order in which you turn on the switches, as in the app.
To change the order: turn off the zones, then turn them back on in the desired order.
The order is kept even after a restart of the integration.
[/quote]
- Finally, I saw on the Roborock integration that the robot’s path is drawn on the map: Intégration Externe - Roborock - #30 par guim31
That would also be cool!